EVRAZ STEEL BUILDING Beats Last Year's Record
EVRAZ STEEL BUILDING set a new production record based on October 2025 results. Over the incomplete 10 months of the current year, 53.5 thousand tonnes of metal structures were shipped to the market, surpassing the total for all 12 months of 2024 (51.5 thousand tonnes). This demonstrates the company's consistent positive growth for three consecutive years.
These achievements provide compelling evidence of the effectiveness of EVRAZ STEEL BUILDING's chosen business strategy. This growth was made possible even amid a decline in overall activity in the steel construction market.
According to the company's Executive Director Maxim Bedenko, the key to success lies in the cohesive teamwork across all stages — from the initial project concept to the final delivery to the client. The company's potential was particularly evident in October, when several records were set.
In October alone, 10,052 tonnes of metal were shipped to 41 manufacturing plants, while the EVRAZ STEEL BUILDING engineering centre, in cooperation with 201 contractors, developed and issued 14,422 tonnes of detailed design documentation (KMD). In parallel, 8,039 tonnes of finished metal structures were shipped from 51 partner production sites.
EVRAZ STEEL BUILDING's First Deputy General Director Alexander Mantrov described the result as a "true production hat-trick," noting that record figures were achieved simultaneously across several key divisions of the company, indicating its balanced and sustainable development.
Among the projects for which EVRAZ STEEL BUILDING supplied products are the Torpedo Stadium, Novocherskasskaya GRES, the production building for electrical equipment at a plant in Vladimir Region, the shopping centre near Ryazansky Prospekt metro station, and the sinter plant at EVRAZ ZSMK with its famous Siberian Eiffel Tower.